Project Controls Road Map, from Tender to Final Account

Six stages, one road. At each stop: the schedule, cost and claim tools, templates and guides you need there, and the gate to pass before the next. Checks built on DCMA 14-point and standard EVM formulas, run on your own P6 XML or XER data.

  • 6 stages, tender to close-out
  • P6 XML & XER files
  • 31 free templates

Ask a project controls question

English or Arabic. Press Enter to ask. Answers come from a list we wrote and check.

Progress Video from P6: your schedule as a building, planned vs actual floor by floor. Sample tower, illustrative.Try it free →

Not sure where to start?

Find the right tool

Search, or pick what you need to do and what you have. The tools and guides that fit appear below.

1. I need to…

2. I have…optional

Schedule tools read Primavera P6 XML and XER files. All tools are automated.

A short film

Inside OverrunShield: from tender to final account

One office for each stage: tender, planning, progress, cost and contracts. 1 minute 45.

Dramatization, fictional project. Includes AI-generated imagery and synthetic voices.

Why a purpose-built tool

Answers you can put in the monthly report, and get again next month.

Is cost drifting? Is the logic sound? What's about to slip? The same checks, the same thresholds, every month.

01 · COST

Cost drift, visible every month

"The CPI looked fine until it didn't."

Track SPI, CPI, EAC, VAC and TCPI month to month, with the change since last month and an S-curve forecast to EAC.

Monthly progress report →

02 · TIME

Logic checked in minutes, not days

"Checking logic by filter and export."

Upload a zipped P6 XML export and see five DCMA logic checks in your browser in about a minute. The full 14-point PDF is emailed to you.

Free DCMA audit →

03 · RISK

Slippage seen before it lands

"The update quietly moved the finish."

Compare baseline to update to catch float erosion, relationship edits and near-critical movement. Monte Carlo gives P50/P80/P90 finish confidence.

Compare two schedules →

04 · PORTFOLIO

Which project needs attention first

"Five programmes, five schedules, one steering meeting."

Upload 2 to 5 Primavera P6 XML or XER schedules and get one red, amber, green table: schedule quality, SPI and finish slip side by side. Free on screen, no signup.

Check your portfolio →

A general AI chat assistant vs. a purpose-built engine

DimensionGeneral-purpose AI chat assistantOverrunShield
ReadsWhat you paste or upload, interpreted as promptedThe P6 XML logic network, natively: activities, relationships, constraints, calendars, float
RulesWhatever the prompt specifiesFixed DCMA 14-point thresholds and standard EVM formulas
Run it twiceWording and figures may differSame file in, same result out (DCMA and EVM engines)
DeliverableA chat transcriptA standard report you can file or forward, with its limits stated

Automated first-pass diagnostics, not a certified expert review. The tools surface the issues; the decisions stay with you.

Prolongation Costs, Explained

Count the compensable days, price site costs at delay-period rates, and compare Hudson, Emden and Eichleay, worked through.

Anatomy of a $45M Overrun

How four levels of analytics caught a $45M forecast overrun and 195 days of critical-path slip at 53% complete — not at handover.

Concurrent Delay, Explained

What counts as concurrent, how SCL, FIDIC, JCT and NEC4 treat it, and why it usually costs the contractor the money but not the time.

Time Impact Analysis, Explained

How a delay event gets modeled on the live schedule to project its EOT impact before it finishes playing out.

Free templates

Free project management templates for construction

The records a programme, a delay or a handover is judged on: fillable Word forms and Excel registers with formulas, with your company logo in the header.

Browse all 31 templates →31 Word templates · 16 Excel registers · free
Who’s Behind OverrunShield

Built by a project controls practitioner, for the people answering to steering committees

OverrunShield exists because critical schedule flaws are visible in the data months before they trigger red flags on a monthly report — if someone knows how to run the right diagnostics. We turn years of infrastructure and capital program experience into automated, forensic-grade analysis tools.

AG
Ayman G.

Founder · Project controls & planning

OverrunShield’s checks are built from hands-on work with Primavera P6, earned value management and delay analysis on projects with rigid budgets and unforgiving timelines. The automated tools run those diagnostics on your schedule; Tender Brief and Start-Up Package orders are prepared from your documents by the founder.

  • Automated diagnostics: built on DCMA 14-Point and industry-standard integrity checks.
  • Automated today: every audit runs the full diagnostic; email us with questions about your results.
  • P6-native support: seamless extraction and analysis of .XER and .XML project schedules.

Talk to a human

Have questions about how the audit works, security protocols, or custom dashboard integrations? We respond to every schedule inquiry within one business day.

Confidentiality: your files are used only to produce your result. Documents uploaded with an order are kept privately and deleted 7 days after it is delivered, cancelled or refunded. Read our Privacy Policy.